Nobody publishes tile pricing, and the reason given is always that every job is different. Every job is different. It is still possible to say what the market charges and what moves a number, and not saying it mostly protects the contractor.

Everything below is a published market range as of August 2026. None of it is a quote from us, and our own number comes after somebody has stood in the room.

The two halves of a tile quote

Material. Standard residential porcelain runs roughly $3 to $5 per square foot. Below that you are in builder-grade ceramic, which is thinner and chips at the edges. Above it you are into large-format, decorative and natural stone, which have no upper bound — a book-matched porcelain slab is priced per slab and a marble mosaic can cost more per square foot than the labour to set it.

Labour and setting materials. Roughly $5 to $8 per square foot for straightforward floor tile in an open room. Across the full range of formats and layouts, tile labour spans roughly $5 to $22 per square foot.

That spread is not contractors charging what they feel like. It is the difference between a rectangular floor in 12×24 laid straight, and a herringbone wall with a niche, a curbless entry and three mitred external corners.

The four things that move the number

1. Substrate. The largest and least visible variable. A flat, sound slab is the cheap case. Anything else means levelling — a market range of $2 to $5 per square foot — or, in an older Florida house, dealing with what is actually under the existing floor before anything new goes down. Two quotes that differ by half usually differ here.

2. Layout and format. Straight-set is the baseline. Diagonal adds cuts. Herringbone and chevron add a lot of cuts and a lot of setting-out time. Large-format adds handling and flatness requirements. Small mosaic adds sheer piece count.

3. Edges and details. Flat field is fast. Niches, benches, curbless entries, mitred corners, Schluter profiles and pattern changes are all hand work and all slower than they look. A shower is not a small floor; it is the most detailed square footage in the house.

4. Demolition and disposal. Taking out an existing floor, especially one bedded in mud or bonded to a slab, is real labour and the debris has to go somewhere. In this county that is a line item.

What is specific to houses on this coast

Slab on grade. Most houses here sit on a concrete slab. Slabs wick moisture and they move with the season. Porcelain and ceramic do not care about moisture, which is one reason tile is so dominant here. What they do care about is movement — which is why a job done properly has movement joints where the industry says they go: at the perimeter, over existing slab joints, and at changes of plane. A tiled floor run wall-to-wall with no perimeter gap will eventually tent, and it is not a material failure.

Salt air. Within a mile or two of the water, metal is the weak point. Fixings, profiles, drains and fittings should be specified accordingly. This is usually a small cost that gets skipped and shows up as rust staining in year three.

Sand. It is an abrasive, it comes in on feet all year, and it is why glazed porcelain in a coastal house outlasts most alternatives.

How to compare two quotes honestly

Ask both to itemise:

  • Substrate preparation as a separate line, including levelling.
  • Demolition and disposal as a separate line.
  • The setting material and the waterproofing system by name.
  • Movement joints — where, and what fills them.
  • Waste allowance as a percentage, and who owns the leftover.

The cheaper quote is often the one that has left one of those out. Getting both priced on the same scope is the only way to know.

Where the money is worth spending

If a budget has to give somewhere, give on the material before the labour. A mid-priced porcelain set beautifully looks expensive. An expensive tile set badly looks like a mistake, and it is the only half of the job you cannot redo without taking the first one out.